SICSR-10184
| [SICSR-10184] MCPO Assigning Incorrect PP Year | |
|---|---|
| Product Line: | Cede |
| Component/s: | Business Protection Assignments |
| Affects Version/s: | SICS 4.5.2 SSP16 |
| Fix Version/s: | SICS 20.1 |
| Customer: | Houston International Insurance Group |
| External Issue ID: | n/a |
Problem:
MCPO Assigning Incorrect PP Year
Solution:
On trying to protect the Light Claim with MCPO or either through Automatic Assignment to Protection Program, PP of the Insured Period in both cases should remain same. And it should get derived on claim basis taken in the treaty.
If there is a match on two different Insured Periods of the Protection Program section, both periods must be assigned to claim (this could happen if the IP at OCC level is different from PP insured period).
Workaround:
Manual protection from light claim
Root Cause:
Extent of Impact:
Impact on Existing Data
Recovery Method for Existing Data Affected