SICSR-11308
| [SICSR-11308] Incorrect Original Policy Period Validation on Claims Program linked to “Losses Occurring” Businesses | |
|---|---|
| Product Line: | P&C |
| Component/s: | Claims |
| Affects Version/s: | SICS 4.7 |
| Fix Version/s: | SICS 20.1 |
| Issue Links: | is duplicated by SICSR-17307 |
| Customer: | DXC |
| External Issue ID: | n/a |
Problem:
System raises validation error CM0305 when creating a claim from the business, when the original policy period is not within insured period when attempting to link the claim to a claim program with period same as insured period, despite parameter do not validate OPP on Losses Occurring is activated
Solution:
the system should raise validation warning CM0382 instead of the above error
Workaround:
create the claim from the claim program
Root Cause:
Extent of Impact:
Impact on Existing Data
Recovery Method for Existing Data Affected