Summary #
| Key | Customer | External issue id | Component(s) |
|---|---|---|---|
| SICSR-21229 | Africa Re | Accounting Cession/Retrocession (Life) | |
| SICSR-21240 | Allianz AG | RC-682 | Accounting Prop Retro |
| SICSR-21531 | Africa Re | Accounting Cession/Retrocession (Life) | |
| SICSR-20508 | Africa Re | Business Underwriters Estimates | |
| SICSR-11943 | China Re | Database Setup | |
| SICSR-20134 | Heng An | Life | |
| SICSR-20481 | DXC | MTK | |
| SICSR-20922 | Africa Re | Life Cession Handling | |
| SICSR-20961 | Heng An | Life Retrocession Handling | |
| SICSR-20971 | Life Cession Handling | ||
| SICSR-21028 | Life Cession Handling | ||
| SICSR-21047 | DXC | Life Cession Handling | |
| SICSR-21057 | DXC | Life Claims Handling | |
| SICSR-21063 | Africa Re | AFR-868/AFR-1128 | Life |
| SICSR-21077 | DXC | Life | |
| SICSR-21106 | Multi GAAP - Accounting | ||
| SICSR-21257 | DXC | Life Cession Handling | |
| SICSR-21267 | DXC | Life Cession Handling | |
| SICSR-21270 | Africa Re | Multi GAAP - Accounting | |
| SICSR-21375 | DXC | Life Cession Handling | |
| SICSR-21379 | Africa Re | Life | |
| SICSR-21401 | DXC | Multi GAAP - Business | |
| SICSR-21427 | Allianz AG | RC-698 | Multi GAAP - Accounting |
| SICSR-21456 | Africa Re | Life Cession Handling | |
| SICSR-21475 | DXC | Life Claims Handling | |
| SICSR-21477 | DXC | Life Claims Handling | |
| SICSR-21486 | DXC | Life | |
| SICSR-21550 | DXC | Multi GAAP - Business | |
| SICSR-21553 | Life Cession Handling | ||
| SICSR-21581 | DXC | Life Cession Handling | |
| SICSR-21598 | Heng An | Life Retrocession Handling | |
| SICSR-21609 | Heng An | Life Cession Handling | |
| SICSR-21651 | DXC | Life Cession Handling | |
| SICSR-21682 | DXC | Life Cession Handling | |
| SICSR-21703 | DXC | Life | |
| SE-5241 | DXC | Life | |
| SE-5264 | Heng An Standard Life | Life | |
| SE-5294 | Heng An Standard Life | Life | |
| SE-6227 | Heng An Standard Life | Life | |
| SE-6266 | DXC | Life | |
| SE-6460 | DXC | Life | |
| SE-6710 | DXC | Life | |
| SE-6719 | DXC | Life | |
| SE-6721 | Heng An Standard Life | Life | |
| SE-6781 | DXC | MG & Reserve Orders |
Cases #
SICSR-21229 - Reversal of Worksheets with original Accounting Year/Period not working properly #
| Product line | Life |
| Component(s) | Accounting Cession/Retrocession (Life) |
| Affects version(s) | SICS 20.4 SSP1 |
| Fix version(s) | SICS 21.2 |
| Customer | Africa Re |
Problem: When the flag 'Original Accounting Year and Period' is selected on the Insured Period Tab of the AB or OCC, the following should be applicable to manually created technical worksheets and technical worksheets created through the orders where the copy, reverse function is applicable 1. The Original Accounting Year and Period values from the previous booking detail should be copied to all the booking details created on the TW when selecting Add Booking 2. When the worksheet/ balance/ detail is copied - copy the values in the field Original Acc Year and Period from the source bookings 3. When the worksheet/ balance/ detail is reversed- copy the values in the field Original Acc Year and Period from the source bookings and keep the field editable (similar to the booking year and period field) 4. When the worksheet/ balance/ detail is reversed and replaced- copy the values in the field Original Acc Year and Period from the source bookings and keep the field editable (similar to the booking year and period field) Declination Reason: Workaround: Root Cause: Extent of Impact: Impact on Existing Data Recovery Method for Existing Data Affected |
|
SICSR-21240 - Abend when create TW in Life on Assumed Business protected by Prop OCC or STP #
| Product line | Life |
| Component(s) | Accounting Prop Retro |
| Affects version(s) | SICS 20.4 |
| Fix version(s) | SICS 21.2 SICS 20.4 SSP1 ALL1 |
| Customer | Allianz AG |
Problem: Abend when create TW in Life on Assumed Business protected by Prop OCC or STP Solution: When the account admin basis on the AB is Bulk and there is any protection attached on the Proportional Protection (PP condition) whether it is aSTP or a QS OCC and a technical booking is made on the assumed business the system should not abend- the bookings should be booked on the OCC in the retrocedd percentage as 'As Original' bookings When there is a non Prop Protection (NP condition) - TW should be closed on the inward business without abend, there will be no bookings flowing to the non prop STP or OCC |
|
SICSR-21531 - Mortality Factor with Reason for Loading = 'Above Free Cover Limit' does not flow to the Retrocession Cession from Inward #
| Product line | Life |
| Component(s) | Accounting Cession/Retrocession (Life) |
| Affects version(s) | SICS 20.4 SSP2 |
| Fix version(s) | SICS 21.2 |
| Customer | Africa Re |
Problem: Mortality Factor with Reason for Loading = 'Above Free Cover Limit' does not flow to the Retrocession Cession from Inward Solution: The Loadings from the inward cession should be copied to the retrocession cession and placements When the reason for loading is 'Above Free Cover Limt' the same calculation as per the inward cession should be applicable on the retrocession cessions and the Extra Premium should be calculated on the retrocessions Declination Reason: Workaround:* Root Cause: Extent of Impact: Impact on Existing Data Recovery Method for Existing Data Affected |
|
SICSR-20508 - UW Estimates calculation variables for extra premium commission gives error message #
| Product line | Life |
| Component(s) | Business Underwriters Estimates |
| Affects version(s) | SICS 20.3 |
| Fix version(s) | SICS 21.2 |
| Customer | Africa Re |
Problem: Underwriters Estimates calculations using calculation variables for Basic Multiple Extra Commission or Flat or Per Mille Extra Commission give an error message when the flag 'Same As For Basic Premium' is selected in the Deductions condition/Extra Premium Commission tab Solution: Calculate zero in the above situation, without giving any error message. Note: The calculation variables do NOT retrieve values from the Basic Premium. Such functionality is not supported, and will not be implemented in this case. Workaround: Define the extra premium exactly as per the definition on the Basic Premium Tab Root Cause: Extent of Impact: Impact on Existing Data Recovery Method for Existing Data Affected |
|
SICSR-11943 - When change SICS login password, including special characters is not allowed. #
| Product line | Life |
| Component(s) | Database Setup |
| Affects version(s) | SICS 4.7 SSP13 |
| Fix version(s) | SICS 21.2 |
| Customer | China Re |
Problem: Declination Reason: If the password is not enclosed in quotes then it can include any letter, any digit, '_', '#' or '$' characters. Only a letter can be used in the first character, the other characters can be used after that. If on the other hand you enclose the password in quotes then you can use any character in any position. Workaround: Root Cause: Extent of Impact: Impact on Existing Data Recovery Method for Existing Data Affected |
|
SICSR-20134 - Premium calculation wrong with short-term premium rate table #
| Product line | Life |
| Component(s) | Life |
| Affects version(s) | SICS 20.3 |
| Fix version(s) | SICS 21.2 |
| Customer | Heng An |
Problem: Declination Reason: Workaround: Root Cause: Extent of Impact: Impact on Existing Data Recovery Method for Existing Data Affected |
|
SICSR-20481 - Abends while generating DD Record Def. #
| Product line | Life |
| Component(s) | MTK |
| Affects version(s) | SICS 20.3 |
| Fix version(s) | SICS 21.2 |
| Customer | DXC |
Problem: Abends while generating DD Record Def. Verification Steps ( How to recreate the error): SICS4LIFE@CSCDBSOSL003V - b4211ga
java.lang.IndexOutOfBoundsException: Index 0 out of bounds for length 0java.lang.IndexOutOfBoundsException: Index 0 out of bounds for length 0 . . . com.csc.sics.lf.migration.roledefinition.SicsLfMigrationAbstractRole.getLastRootChainForSequence(SicsLfMigrationAbstractRole.java:522) at com.csc.sics.lf.migration.roledefinition.SicsLfMigrationAbstractRole.isExtractedBefore(SicsLfMigrationAbstractRole.java:576) . . . Solution: System should not give abend and should work as per existing functionality. Workaround: The client could use this now, not in one year when correction released Root Cause: In case When we click on generate 'DD Record Def.', it starts sorting. all SicsLfMigrationDefinition elements Extent of Impact: Impact on Existing Data Recovery Method for Existing Data Affected |
|
SICSR-20922 - Add Business option on Life Cession Related Orders #
| Product line | Life |
| Component(s) | Life Cession Handling |
| Affects version(s) | SICS 20.3 |
| Fix version(s) | SICS 21.2 |
| Customer | Africa Re |
+Problem: Add Business option on Life Cession Related Orders Solution: Cession Renewal Order Workaround: Root Cause: Extent of Impact: Impact on Existing Data Recovery Method for Existing Data Affected |
|
SICSR-20961 - An error message when runing RPO if PM condition has calculation rule #
| Product line | Life |
| Component(s) | Life Retrocession Handling |
| Affects version(s) | SICS 20.3 |
| Fix version(s) | SICS 21.2 |
| Customer | Heng An |
Problem: Solution: The premium should be calculated as per the calculation rule defined on the respective levels of business. No error message should be thrown when the Premium calculation is being done on the outward business and the inward business calculation rules should not be validated by the RPO Declination Reason: Workaround: Root Cause: Extent of Impact: Impact on Existing Data Recovery Method for Existing Data Affected |
|
SICSR-20971 - When create a new Cession Renewal Order through Copy Order option SICS automatically change Renewal year as latest year #
| Product line | Life |
| Component(s) | Life Cession Handling |
| Affects version(s) | SICS 21.1 |
| Fix version(s) | SICS 21.2 |
| Customer | |
+Problem: When creating a new Cession Renewal Order through Copy Order option SICS automatically change Renewal year as latest year after a full refresh Solution: Declination Reason: Workaround: Root Cause: Extent of Impact: Impact on Existing Data Recovery Method for Existing Data Affected |
|
SICSR-21028 - Group Scheme No of Lives, Male expiry age and Female expiry age data size error. #
| Product line | Life |
| Component(s) | Life Cession Handling |
| Affects version(s) | SICS 21.1 |
| Fix version(s) | SICS 21.2 |
| Customer | |
Problem: Group Scheme Number of Lives field should accept up to 10 digits Male Expiry Age and Female Expiry Age should accept up to the age 999 similar to the Expiry Age on the main cession Declination Reason: Workaround: Root Cause: Extent of Impact: Impact on Existing Data Recovery Method for Existing Data Affected |
|
SICSR-21047 - Free Cover Limit Extra Premium not calculated correctly when SI-FCL> Auto Cover Limit #
| Product line | Life |
| Component(s) | Life Cession Handling |
| Affects version(s) | SICS 20.4 SSP1 |
| Fix version(s) | SICS 21.2 |
| Customer | DXC |
Problem: Solution: Declination Reason: Workaround: Root Cause: Extent of Impact: Impact on Existing Data Recovery Method for Existing Data Affected |
|
SICSR-21057 - System abends while creating claim with Paid status for Non Prop Business. #
| Product line | Life |
| Component(s) | Life Claims Handling |
| Affects version(s) | SICS 21.1 |
| Fix version(s) | SICS 21.2 |
| Customer | DXC |
Problem: Solution: Declination Reason: Workaround: Root Cause: Extent of Impact: Impact on Existing Data Recovery Method for Existing Data Affected |
|
SICSR-21063 - Technical worksheet: abend during closing when Treaty is protected by an OCC #
| Product line | Life |
| Component(s) | Life |
| Affects version(s) | SICS 20.4 SSP1 |
| Fix version(s) | SICS 21.2 |
| Customer | Africa Re |
SICSR-21077 - System is throwing error for Joint Life Name allowable size, whereas same number is allowed for Single Life #
| Product line | Life |
| Component(s) | Life |
| Affects version(s) | SICS 21.1 |
| Fix version(s) | SICS 21.2 |
| Customer | DXC |
Problem: Solution: Increase the size of the Joint Life Insurable object to 300 characters from 80 i.e to accommodate the maximum number of characters for two individual lives with a first name last name and middle name of 50 characters each When the size exceeds 300 characters in case of more than two lives with 150 char names each, reject the IO name similar to what happens online Workaround: Root Cause: Extent of Impact: Impact on Existing Data Recovery Method for Existing Data Affected |
|
SICSR-21106 - SICS Life - Multi GAAP Recalculation Order - Outward business not working #
| Product line | Life |
| Component(s) | Multi GAAP - Accounting |
| Affects version(s) | SICS 21.1 |
| Fix version(s) | SICS 21.2 |
| Customer | |
Problem: Multi GAAP Recalculation Order does not create Period Estimates on Retrocessionaire's Placements in SICS Life Solution: When Multi GAAP Recalculation Order is run on Level of Business = Outward Cedent's Contract and Retrocessionaire's Placements, the Order should add the Period Estimate Currency both on the Outward Cedent's Contract and the corresponding Retrocessionaire's Placements ++Workaround: Root Cause: Extent of Impact: Impact on Existing Data Recovery Method for Existing Data Affected |
|
SICSR-21257 - System Abend when AB & Cession Both have not update calculation frequency for Premium #
| Product line | Life |
| Component(s) | Life Cession Handling |
| Affects version(s) | SICS 21.2 |
| Fix version(s) | SICS 21.2 |
| Customer | DXC |
Problem: System Abend when click on Main,SAR & ACIs button if AB & Cession both have not update calculation frequency for Premium Solution: When there is no Renewal Frequency defined on the cession and the user presses the Main OR SAR button OR the ACI button and saves the cession benefit, the validation error message 'Renewal Frequency is required' should be thrown and the system should not abend Declination Reason: Workaround: Root Cause: Extent of Impact: Impact on Existing Data Recovery Method for Existing Data Affected |
|
SICSR-21267 - System incorrectly creating duplicate benefits on the same cession through loader #
| Product line | Life |
| Component(s) | Life Cession Handling |
| Affects version(s) | SICS 20.2 |
| Fix version(s) | SICS 21.2 |
| Customer | DXC |
Problem: Solution: In case the batch has both identical and non-identical records, then the non-identical records should get loaded and these identical records should get rejected through batch. And they should appear in the sub batch. If there are two different insurable objects on the policy record and the mapping has been done to create a joint life insurable object, then the cession should be created with the joint life IO and the benefits should be created on the same cession against the respective individual IOs as per existing functionality Declination Reason: Workaround: Root Cause: Extent of Impact: Impact on Existing Data Recovery Method for Existing Data Affected |
|
SICSR-21270 - Function 'Booked amounts for Original Accounting Period' not working correctly #
| Product line | Life |
| Component(s) | Multi GAAP - Accounting |
| Affects version(s) | SICS 20.4 SSP2 |
| Fix version(s) | SICS 21.2 |
| Customer | Africa Re |
Problem: Multi GAAP calculation functions 'Booked amounts for Original Accounting Period' does not retrieve bookings correctly when Estimation Basis is set to Booking Year in Multi GAAP/General system parameter Solution: Make sure the functions retrieve bookings from the Business Ledger with an Original AccYr and Original AccPeriod equal to the accounting period in the Period Estimates Workaround: None Root Cause: Extent of Impact: Impact on Existing Data Recovery Method for Existing Data Affected |
|
SICSR-21375 - Unable to add more than one PP in the RPO #
| Product line | Life |
| Component(s) | Life Cession Handling |
| Affects version(s) | SICS 21.2 |
| Fix version(s) | SICS 21.2 |
| Customer | DXC |
Problem: Unable to add more than one PP in the RPO Solution: When the Allow more than one PP option is selected the option Add Business should be enabled after adding one PP Declination Reason: Workaround: Root Cause: Extent of Impact: Impact on Existing Data Recovery Method for Existing Data Affected |
|
SICSR-21379 - The cession details on worksheet are not aggregating based on the entry codes #
| Product line | Life |
| Component(s) | Life |
| Affects version(s) | SICS 20.4 SSP1 |
| Fix version(s) | SICS 21.2 |
| Customer | Africa Re |
Problem: Solution: When the cession or retrocession cession order is run, the balance details should be aggregated within each section/ insured period/ accounting year and period/ original accounting year and period- on the basis of the entry code Declination Reason: Workaround: Root Cause: Extent of Impact: Impact on Existing Data Recovery Method for Existing Data Affected |
|
SICSR-21401 - Period Estimates not created on placements when created on the Outward Cedent's Contract #
| Product line | Life |
| Component(s) | Multi GAAP - Business |
| Affects version(s) | SICS 21.1 |
| Fix version(s) | SICS 21.2 |
| Customer | DXC |
Problem: When a Period Estimate currency is added to an Outward Cedent's Contract, the Period Estimates are not automatically added to the placements Solution: When a Period Estimate currency is added to an Outward Cedent's Contract, I should be given an option to add the same Period Estimate currency on all placements. Workaround: Add the Period Estimate currency manually on each placement Root Cause: Missing in original implementation Extent of Impact: Impact on Existing Data Recovery Method for Existing Data Affected |
|
SICSR-21427 - SE-1661 not working for manual worksheets when OCC has multiple insured periods #
| Product line | Life |
| Component(s) | Multi GAAP - Accounting |
| Affects version(s) | SICS 20.4 |
| Fix version(s) | SICS 21.2 SICS 20.4 SSP1 ALL2 |
| Customer | Allianz AG |
Problem: When system parameter 'Create Retro Link Of Source Business' is selected, and a Source Assumed Business is selected on the Assumed Businesses window of an Outward Cedent's Contract, the system should automatically create a link to the selected assumed business when running Multi GAAP Retrocession Order and when creating a manual technical worksheet on the OCC. This does not work for manual technical worksheets if the OCC has multiple Insured Periods. Instead, AC0551 is given, asking the user to link the booking details to an insured period on the protected business. Solution: Make sure the system automatically make a link to the Source Business defined for each insured period on the OCC Workaround: Root Cause: SE-1661 Extent of Impact: Impact on Existing Data Recovery Method for Existing Data Affected |
|
SICSR-21456 - Calculation of SAR on Cession Transaction New Business to be reviewed #
| Product line | Life |
| Component(s) | Life Cession Handling |
| Affects version(s) | SICS 20.4 SSP2 |
| Fix version(s) | SICS 21.2 |
| Customer | Africa Re |
Problem: Solution: When the Benefit Term is less than the duration of the renewal frequency period (i.e if the renewal frequency = Yearly and the benefit term is less than 365 days or if the renewal frequency is Quarterly and the benefit term is less than 90 days etc), do not attempt to recalculate the Sum at Risk when the SAR button on the cession benefit is applied Declination Reason: Workaround: Root Cause: Extent of Impact: Impact on Existing Data Recovery Method for Existing Data Affected |
|
SICSR-21475 - Loader Should Allow 'Cede Paid' status Claim to be Uploaded with Empty Correspondence Date and Notification Date #
| Product line | Life |
| Component(s) | Life Claims Handling |
| Affects version(s) | SICS 21.2 |
| Fix version(s) | SICS 21.2 |
| Customer | DXC |
Problem: Solution: Do not validate the Correspondence Date and Notification Date or Claim Cause of Loss and Claim Cause of Loss Group on a claim that has the status of Ceded Paid Declination Reason: Workaround: Root Cause: Extent of Impact: Impact on Existing Data Recovery Method for Existing Data Affected |
|
SICSR-21477 - Increase the maximum UDF fields (DATE and STRING data type) on SICS Claim #
| Product line | Life |
| Component(s) | Life Claims Handling |
| Affects version(s) | SICS 21.2 |
| Fix version(s) | SICS 21.2 |
| Customer | DXC |
Problem: Solution: This should be applicable to manual cessions, and claims - both inward and outward- OCC level and placement level Declination Reason: Workaround: Root Cause: Extent of Impact: Impact on Existing Data Recovery Method for Existing Data Affected |
|
SICSR-21486 - Abend when the ID type, ID IO of second life is blanc in the loader file #
| Product line | Life |
| Component(s) | Life |
| Affects version(s) | SICS 21.2 |
| Fix version(s) | SICS 21.2 |
| Customer | DXC |
Problem: Solution: If any one or more fields in addition to the LIFE_ID_TYPE are mapped in a joint life block then the joint life block will be considered as expected to create a joint life insurable object and will need to be validated for the following mandatory fields LIFE_ID If any one of these fields is not available then the record should fail with the message 'Missing Mandatory field <Missing field name> in the Joint Life Block' If only the LIFE_ID_TYPE is mapped and there is no other data mapped to the joint life block, then the joint life block should be ignored. If there is no other Joint Life block, then the cession will be created as an individual insurable object. If there are other joint life blocks with all the mandatory information, then the joint life IO and cession should be created using those values and the block with only the LIFE_ID_TYPE will be ignored Declination Reason: Workaround: Root Cause: Extent of Impact: Impact on Existing Data Recovery Method for Existing Data Affected |
|
SICSR-21550 - Last Projection Year defined on Outward Cedent's Contract is not reflected on placements #
| Product line | Life |
| Component(s) | Multi GAAP - Business |
| Affects version(s) | SICS 21.1 |
| Fix version(s) | SICS 21.2 |
| Customer | DXC |
Problem: The Last Projection Year defined on an Outward Cedent's Contract is not reflected on the Retrocessionaire's placements Solution: Last Projection year on the Retrocessionaire's placements should always be copied from the Outward Cedent's contract and should not be possible to overwrite on the placement Workaround: Root Cause: Extent of Impact: Impact on Existing Data Recovery Method for Existing Data Affected |
|
SICSR-21553 - The flag ‘Allow Partial Processing of Cession Batch’ is not getting displayed on the batch, for both open and closed ended business #
| Product line | Life |
| Component(s) | Life Cession Handling |
| Affects version(s) | SICS 21.2 |
| Fix version(s) | SICS 21.2 |
| Customer | |
Problem: Solution: The flag 'Allow Partial Processing of Cession Batch' should be copied from the selection on the Business tab of the business insured period that is selected on the cession batch. Declination Reason: Workaround: Root Cause: Extent of Impact: Impact on Existing Data Recovery Method for Existing Data Affected |
|
SICSR-21581 - Adjustment Reversals are not generated on Cession via Loader #
| Product line | Life |
| Component(s) | Life Cession Handling |
| Affects version(s) | SICS 21.2 |
| Fix version(s) | SICS 21.2 |
| Customer | DXC |
Problem: Adjustment Reversals are not generated on Cession via Loader Solution: Declination Reason: Workaround: Root Cause: Extent of Impact: Impact on Existing Data Recovery Method for Existing Data Affected |
|
SICSR-21598 - Retrocession are not generated for Maturity transaction #
| Product line | Life |
| Component(s) | Life Retrocession Handling |
| Affects version(s) | SICS 21.2 |
| Fix version(s) | SICS 21.2 |
| Customer | Heng An |
Problem: Solution: When the Ceded flag is selected- for any termination transaction on the inward cession a full recapture should be generated on the outward cession Declination Reason: Workaround: Root Cause: Extent of Impact: Impact on Existing Data Recovery Method for Existing Data Affected |
|
SICSR-21609 - Amendment not picked up correctly by RPO #
| Product line | Life |
| Component(s) | Life Cession Handling |
| Affects version(s) | SICS 21.2 |
| Fix version(s) | SICS 21.2 |
| Customer | Heng An |
Problem: Solution: Declination Reason: Workaround: Root Cause: Extent of Impact: Impact on Existing Data Recovery Method for Existing Data Affected |
|
SICSR-21651 - Premium Term incorrect on renewals and on retro transactions #
| Product line | Life |
| Component(s) | Life Cession Handling |
| Affects version(s) | SICS 21.2 |
| Fix version(s) | SICS 21.2 |
| Customer | DXC |
Problem: Premium Paying Term incorrect on inward cession transactions and on retros Solution: When the Premium Paying Term is explicitly mapped/ input, this value should not be updated based on the benefit term- this is applicable for both NB and Other and Extended Term The PPT should be copied from the inward cession to the outward cessions and the placements- This is applicable for both Linked Retros and Standalone Retros (with and without the ceded flag) Declination Reason: Workaround: Root Cause: Extent of Impact: Impact on Existing Data Recovery Method for Existing Data Affected |
|
SICSR-21682 - System Abend When Reversing Cession's New Business Transaction via Loader #
| Product line | Life |
| Component(s) | Life Cession Handling |
| Affects version(s) | SICS 21.2 |
| Fix version(s) | SICS 21.2 |
| Customer | DXC |
Problem: Solution: When an Adjustment Reversal transaction is created (both manual and through loader) If the transaction being reversed has a transaction code of 'New Business' or 'Old Business' then the adjustment reversal transaction should not be allowed Declination Reason: Workaround: Root Cause: Extent of Impact: Impact on Existing Data Recovery Method for Existing Data Affected |
|
SICSR-21703 - Decimals incorrectly calculated when SAR is 'Our Share' resulting in incorrect retros #
| Product line | Life |
| Component(s) | Life |
| Affects version(s) | SICS 21.1 |
| Fix version(s) | SICS 21.2 |
| Customer | DXC |
Problem: Solution: When the system parameter Cession Sum at Risk amounts in decimals is NOT selected: Declination Reason: Workaround: Root Cause: Extent of Impact: Impact on Existing Data Recovery Method for Existing Data Affected |
|
SE-5241 - Spec- Cession Loader to process Blank Column Headers and Duplicate Column Headers without error #
| Product line | Life |
| Component(s) | Life |
| Affects version(s) | |
| Fix version(s) | SICS 21.2 |
| Customer | DXC |
Aim of function The aim of this enhancement is for the cession loader to handle blank column headers or duplicate column headers during the import process and allow the user to import the input file with blank column headers or duplicate column headers and allow the user to create mappings This epic has covered the detailed specification of the requirement System Parameters Affected None Existing functionality affected None |
|
SE-5264 - To not round sum at risk of Cession for calculating retrocession retroceded amount #
| Product line | Life |
| Component(s) | Life |
| Affects version(s) | |
| Fix version(s) | SICS 21.2 |
| Customer | Heng An Standard Life |
Aim of function The aim of this enhancement is to be support calculating and accumulating the Sum at Risk amounts to up to 6 decimals and processing the retrocession cessions and applying the ceded ratio on the sum at risk figures that have 6 decimals System Parameters Affected New system parameter where the user is allowed to define the number of decimals that can be accepted on any of the Sum at Risk fields is available. You can define a value to accept up to 6 decimals Existing functionality affected Depending on the number of decimals that have been selected on the system parameters, the following values on a cession benefit will accept upto and round off the entered amount to that many decimals. The accumulated Sum at Risk will be calculated in decimals and the retroceded sum at risk will be calculated using this SAR amount |
|
SE-5294 - Claim Recovery Calculation Rule for Wavier of Premium Rider Policy' #
| Product line | Life |
| Component(s) | Life |
| Affects version(s) | |
| Fix version(s) | SICS 21.2 |
| Customer | Heng An Standard Life |
Aim of function Summary: Description: Since the claim ACI figure for the wavier of premium rider (WPR) policies are calculated differently from other policies in client's old system (LA), and as a result, the existing claim recovery calculation rule cannot produce the expected result for WPR claims. Hence, client needs a different calculation rule for WPR claims. Client expects SICS to be able to apply different calculation rules based on the following two new fields they will provide to SICS. Two new fields client will pass into SICS: The calculation rule for WPR claims (with the Claim Type of 'P'): System Parameters Affected N/A Existing functionality affected N/A |
|
SE-6227 - To retrocede in sequence: ordered by 'Transaction Date' instead of 'Reinsurance Start Date' #
| Product line | Life |
| Component(s) | Life |
| Affects version(s) | |
| Fix version(s) | SICS 21.2 |
| Customer | Heng An Standard Life |
Aim of function The aim of this enhancement is to be able to use the Original Transaction Date on the cession benefit transaction as the first criteria for sequencing the cessions through the Retrocession Processing Order System Parameters Affected A new system parameter 'Sequencing Based on Original Transaction Date' is available when the system parameter This system parameter may be selected in addition to the system parameter 'Include Policy Number in Sequencing' or independently. Existing functionality affected When the above mentioned system parameter is selected, on each cession benefit transaction a new field 'Original Transaction Date' is available. This field will be defaulted to the effective period start date and can be overridden while manually creating each transaction or when creating the cession benefit transaction through the cession loader When the RPO is run, the cessions will be sequenced based on the Original Transaction Date rather than the Reinsurance Start date or the Transaction Effective Date of each transaction. |
|
SE-6266 - Cession Renewal Order to support Reinsurance Program #
| Product line | Life |
| Component(s) | Life |
| Affects version(s) | |
| Fix version(s) | SICS 21.2 |
| Customer | DXC |
Aim of function The aim of this enhancement is to be able to include Reinsurance Program in a Cession Renewal Order so that all the cessions that are linked to all the Assumed Businesses under the Reinsurance Program are renewed System Parameters Affected None Existing functionality affected The Cession Renewal Order will now have the option to select a Reinsurance Program On running the Cession Renewal Order all the eligible cessions linked to all the Assumed Businesses that are part of the Reinsurance Program will be renewed for the month and year specified in the order |
|
SE-6460 - Spec- Calculation of Premium when Benefit Term in Days- Additional Requirements #
| Product line | Life |
| Component(s) | Life |
| Affects version(s) | |
| Fix version(s) | SICS 21.2 |
| Customer | DXC |
Aim of function When the premium paying term or the benefit term is entered in days up to a maximum of 365 days (366 for a leap year), they value should remain as entered and this value should be used to calculate the ACIs when the tables that are used for calculation use the term in days as one of the parameters. This epic addressed the specification part of the requirement System Parameters Affected None Existing functionality affected None |
|
SE-6710 - Creation of a file during cession upload having all the reject records #
| Product line | Life |
| Component(s) | Life |
| Affects version(s) | |
| Fix version(s) | SICS 21.2 |
| Customer | DXC |
Aim of function The aim of this enhancement is to be able to create a reject file when a cession batch is partially rejected. This reject file should be created in the same format as the original input file and it should be reusable as is, once the errors are resolved System Parameters Affected None Existing functionality affected When a cession batch has been partially closed and a child batch is created for the error records, a reject file having the some name as the originally imported inforce file will be created and saved in the same location as the original import file. This file will be in the same format as the original file and will have the same name with a suffix _ rejected records. |
|
SE-6719 - Amendments on Cessions linked to treaty with multiple layers #
| Product line | Life |
| Component(s) | Life |
| Affects version(s) | |
| Fix version(s) | SICS 21.2 |
| Customer | DXC |
Aim of function The aim of this enhancement is to be able to handle subsequent amendment and termination transactions on cessions linked to a Reinsurance Program when created through the cession loader System Parameters Affected None Existing functionality affected When a cession benefit transaction such as a renewal, other, or a termination such as a lapse pertaining to a cession that is linked to a more than one layer (assumed business) on a reinsurance program is processed through the cession loader, then this transaction will be updated on all the cession benefits. Each transaction will use the terms and conditions as defined on the respective assumed business sections to which the cession benefit is linked |
|
SE-6721 - Reversal of Claims #
| Product line | Life |
| Component(s) | Life |
| Affects version(s) | |
| Fix version(s) | SICS 21.2 |
| Customer | Heng An Standard Life |
Aim of function The aim of this enhancement is to be able to create an Adjustment Reversal transaction on a Ceded Paid Claim and reverse any Retrocession Claim that was recovered System Parameters Affected None Existing functionality affected None |
|
SE-6781 - Accounting Order Improvements #
| Product line | Life |
| Component(s) | MG & Reserve Orders |
| Affects version(s) | |
| Fix version(s) | SICS 21.2 |
| Customer | DXC |
Aim of function For clients who use both 'Ultimate' and 'Yearly' Projection Bases for estimates, it may be required to use Projection Basis as an extract criteria for Estimation Complete Mass Update and Multi GAAP Stop Calculation Mass Update. We have therefore added Projection Basis as an extract criteria for these two Mass Updates System Parameters Affected None Existing functionality affected Create and run Estimation Complete Mass Update |
|
This report was generated 2021-06-24 06:38:36.